MARTETIC technical guide

Glamping platform on screw piles: what goes into the design and the budget

For a glamping project, the platform must be coordinated with the tent model, the terrace and the services. These decisions affect the foundation and the budget even before the order.

MARTETICGlamping and tourismAbout 5 minutes to read
MARTETIC mechanised installation of a foundation screw
MARTETIC installation of a screw foundation. The photograph illustrates the technology, not the configuration of the glamping example in the article.

Direct answer

A glamping platform on screws includes the foundation, the load-bearing structure, the flooring and the connections the accommodation unit needs. The anchoring of the tent, the bathroom and the utility routes must be defined before execution. The platform's area is useful for the budget, but it does not determine the support grid on its own.

Choose the tent model before fixing the platform dimensions

Ask the manufacturer for the footprint, the anchoring plan and the instructions for installation on a platform. On some models, the area taken by the fixings exceeds the outline of the interior space.

Check the position of the entrance, the doors, the poles and the edges of the membrane. The platform must allow fixing to the elements provided, manage water and give the access wanted. A rectangular deck and a round tent do not automatically become compatible just because they have sufficient areas.

Some manufacturers offer deck anchoring separately. For example, FDomes presents the option of platform anchoring in the configuration of its products. For the tent you choose, ask for the specific detail and the loads transmitted to the support.

What a complete platform includes

Components to specify in the offer
ComponentWhat must be defined
Screw foundationProducts, supports, levels, installation and checks.
Load-bearing structureBeams, stiffening and connections to the foundation.
Interior flooring and terraceDifferent build-ups for the protected and the exposed space.
Tent anchoringPositions and parts in line with the unit's design.
Bathroom and servicesLoads, openings, routes and maintenance access.
Access and protectionStairs, ramps, handrails and lighting, per the design.

When you ask for a price per square metre, attach this list and tick what you want quoted. Two prices for a "platform" can describe very different works.

Planning example: three 8 × 8 m platforms

Three 8 × 8 m platforms means 192 m² of platform. This is an example of organisation and budgeting, not an executed project nor a structural configuration.

If a tent with a diameter of 5 m is placed on each platform, its circular footprint is about 19.6 m². The difference up to 64 m² does not become fully usable free space: the anchorings, circulation, bathroom and the distances required by the chosen model must be checked.

Before calculating the foundation, draw the tent, the terrace, the entrance and the bathroom on the plan. Mark heavy furniture or equipment separately. That way, the structure can be designed for the real use of the platform, without improvised changes after installation.

A light tent can transmit significant loads

The foundation must take the platform's loads and the loads from use, as well as the effects of wind transmitted through the tent's anchoring. A low self-weight does not remove the need to check for uplift and lateral displacement.

Do not assume that attaching the membrane to the deck board is sufficient. The fixings must be tied to structural elements capable of transmitting the loads down to the foundation.

A hot tub, a tank or an area with equipment is not just added to the list of fittings. Their weight in use and their position enter the design brief.

The bathroom and the utilities are coordinated before the foundation

A bathroom brings walls, equipment, floor build-ups and drainage routes. Decide whether it is inside the tent, on the same platform or in a separate unit.

The positions of the connections must be correlated with the beams and the supports. The drainage needs a discharge solution and the levels necessary for it to work. For cold-season operation, the services design must resolve frost protection.

Keep the possibility of inspection and intervention under the platform. A removable decorative screen can be more useful than a closure that prevents access to the pipes.

How to prepare a site with several units

Number the units and use the same code on the plan, in the offer and at installation. For each unit, note the level, the orientation, the access route and the connections.

If the platforms are far apart, mobilising the machine between them and supply can matter a lot. The same total area may need a different organisation on a compact plot than on an extensive property.

A useful approach is to finalise the brief for all the units before the first stage and, when the project justifies it, to use the first platform as a coordination reference for the rest. The ground conditions are checked for the relevant areas, without assuming they are identical everywhere.

What changes the budget and the possibility of relocation

The budget depends on the foundation, the platform structure, the flooring and the related works. The slope, the bathroom, the platform height and the access can change the bill of quantities more than a small difference in area.

Dismantling can be an advantage of a build-up with mechanical joints. Relocation, however, must be prepared through the design: transportable dimensions, access to the joints and checking the components before reuse. Services and finishes can limit what is recovered.

For the planning requirements of the site, consult the guide on the building permit. Being demountable does not, on its own, confirm that a project can be carried out without a permit.

Frequently asked questions

Can I install the tent directly on an existing deck?

Only after checking the structure, the anchoring, the foundation and the compatibility with the tent model. A deck designed for another use may need modifications.

How many screws are needed for an 8 × 8 m platform?

The number is determined from the platform's structure, the loads, the tent details and the ground conditions. The 64 m² area does not define a universal grid.

Can I start with one platform and extend later?

Yes, staging can be prepared from the design. It is worth coordinating the access, connections and levels of the future units from the start.

Can MARTETIC also quote the platform structure?

The request can include the foundation and the supporting structure. The offer specifies the components and works included, depending on the project.

What does a glamping platform on screw piles include?

The screw foundation (products, supports, levels, installation and checks), the load-bearing structure, interior flooring and terrace, tent anchoring, and the bathroom and services.

Should I choose the tent before fixing the platform dimensions?

Yes. Ask the manufacturer for the footprint, the anchoring plan and the installation instructions on a platform. The platform area helps the budget, but it does not determine the support grid on its own.

Preparing one or more glamping units?

Send the tent model, the site plan, the platform dimensions and the position of the bathrooms. Add photographs, levels and information about the access.

The information explains how a project is prepared and is not an execution plan. The solution is determined for the real building and site, on the basis of the applicable documentation and the project's checks.